Auburn High SchoolCosts
Total Cost: $ 39,340,692 Building Cost: $ 33,400,000 Site Cost: $ 5,934,128 Cost PSF: $ 190 Other Costs: $ 5,940,692 Commentary: The project was bid with a number of alternates that allowed the Owner to “adjust” the final construction cost to align with their budget. Careful management of the construction contingency budget allowed for an increase in the technology budget.
|