Romeo Engineering & Technology CenterCosts
Total Cost: $ 19,392,535 Building Cost: $ 12,259,836 Site Cost: $ 1,437,725 Cost PSF: $ 151 Other Costs: $ 3,500,000 Commentary: After bond issue for a second district high school failed, the public supported and passed a bond issue for the creation of an engineering technology center to be located on a district-owned site separate from Romeo High School. This judicious use of public funds relieved overcrowding at the existing high school, significantly upgraded the district’s career/technical programs, and created a flexible building that can be expanded into a second high school in the future.
|