York/Liverpool Elementary SchoolsCosts
Total Cost: $ 15,964,084 Building Cost: $ 13,835,114 Site Cost: $ 1,011,646 Cost PSF: $ 102 Commentary: The final solution has saved money for the school district in several ways:
1. Initially saved $1,200,000 in construction and site development by locating the facility on the campus of the junior high and high school.
2. A substantial amount of operating funds has been saved because of the shared core facilities.
3. The geothermal mechanical system has significantly reduced the energy consumption in the district.
|